2910cf980b82c2cbc078ec36836662a7

Installation and maintenance of ABB frequency converter cabinets.

Regular inspections: Conduct thermal imaging inspections of key components such as IGBT modules, capacitors, and cooling fans within the frequency conversion cabinet to identify potential overheating and aging hazards.
Performance calibration: update the firmware version, optimize operating parameters such as frequency and torque, and improve the energy utilization efficiency of the ship’s power system, potentially achieving a 15% energy-saving effect.
Spare part replacement: Prepare ABB original spare parts in advance, replace aging and vulnerable components as needed to extend the lifespan of the frequency conversion cabinet.

Project Information

Category
Maintenance and installation of variable frequency cabinets
Start Time
15 Oct, 2025
End Time
15 Oct, 2025
Budget
$700
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare